Loose stock
SHELF3 boards and 4 clips
Only loose parts can be assembled or used to rebuild the sign.
WORK 22 / A SHORT STOCKROOM GAME
Management checked each order against the same shelf.
Then it hung a sign saying WE HAVE CAPACITY.
You have one workbench and eight actions before the shift closes.
A fictional company stock room.
ACTIONS USED
One action for each assembly, dismantling, dispatch or sign rebuild. The shift closes after eight actions or when all three orders are dispatched. You can also end it for free.
The workbench holds one kit. Assembling moves its exact recipe from the shelf to the bench. Dismantling returns those parts; the actions used do not return. Dispatched parts cannot return.
2 boards and 2 clips
The standing sign uses two boards and two clips. Dismantling returns them to the shelf. Rebuilding takes the same parts from the shelf.
3 boards and 4 clips
Only loose parts can be assembled or used to rebuild the sign.
Bench empty.
0 boards and 0 clips
Assemble an order to move its parts here.
No orders dispatched.
Total: 0 boards and 0 clips
2 boards and 1 clip
Not assembled
1 board and 2 clips
Not assembled
2 boards and 3 clips
Not assembled
The shift is open. No actions have been used.
Close the shift on the exact state shown here. No action used.
The shift is open.
| Location | Boards | Clips |
|---|---|---|
| Loose on shelf | 3 | 4 |
| Standing sign | 2 | 2 |
| Bench: empty | 0 | 0 |
| Irreversibly dispatched | 0 | 0 |
| Total material | 5 | 6 |
No operations yet.